Mining Tailings Water Works

PLC, HMI and SCADA for a mining tailings water barge pumping system, delivered to client specification under a strict budget and timeline.

Row of pumping barges on a tailings water dam at sunset

Mining tailings water barge pumping system

Industry
Mining & Minerals
Platform
Siemens TIA Portal v17

Scope of work

PLC software development, HMI design and deployment, SCADA design and integration

Project overview

Ivevane Automation was contracted to assist with the PLC software development, HMI design and deployment, and SCADA design and integration for a mining tailings water barge pumping system. The project was based on TIA Portal v17, integrated into a Siemens WinCC OA SCADA system, and had to be developed to specifications supplied by the client, under a strict budget and timeline to meet their targeted use of the barges. The system ran from a containerised MCC with 5 VSDs and 5 priming booster pumps, about 10 pressure transmitters, 2 flowmeters, and alarms and monitoring for container safety and fire signals.

All case studies
Gallery
  • Orange enclosures mounted along the side of a containerised MCC above a cable ladder
    Site installation photo